
We provide commercial sidewalk installation in Conway, AR along with ADA compliant ramps for safe public access.
We provide commercial sidewalk installation in Conway, AR along with ADA compliant ramps for safe public access. Our team builds correct slopes, landings, and detectable warnings where needed. Improve accessibility, meet code, and create smooth walkways throughout your commercial site.
Primetime Concrete Conway provides professional commercial sidewalk installation throughout Conway, AR and the surrounding area. Our licensed, insured crew delivers safe, clean, on-time work with a free estimate before anything begins. Call (806) 513-3678 or request your free quote.

If you manage a property in Conway, you already know that cracked sidewalks and non-compliant ramps can turn into liability headaches fast. Primetime Concrete Conway focuses on commercial sidewalk installation and ADA ramp construction that keeps your site safe, accessible, and looking professional.
We regularly work on retail centers, medical offices, churches, schools, small offices, and industrial sites around Conway, Greenbrier, and the greater Faulkner County area. Whether you need a brand new network of walkways for new construction or replacement of a few failing sections at an existing site, we tailor the design to your actual foot traffic and site conditions, not a one-size-fits-all layout.
From the start, we look at how people really move around your property: where they park, which doors they use most, where delivery trucks turn, and how water flows across your lot during a heavy Arkansas thunderstorm. That information shapes the sidewalk widths, ramp locations, slope, and drainage details so your finished concrete does more than just meet code, it actually works for your customers and staff in day-to-day use.
Our process is built so that your business can keep operating with as little disruption as possible.
1. Site walk and layout We begin with a walk-through of your property. We locate utilities, look at existing elevations, and note problem spots like ponding water or tree roots pushing up old slabs. Then we set out the proposed sidewalk alignment with marking paint and stakes so you can visually confirm that entrances, loading zones, and accessible routes make sense.
2. Permits and coordination In Conway, most commercial sidewalk installation and significant ramp work falls under city permitting and inspection. Primetime Concrete Conway coordinates with the city building department, follows Conway subdivision and commercial design standards, and schedules inspections so you are not stuck chasing paperwork. If your project touches a public right-of-way along streets like Dave Ward Drive or Oak Street, we make sure the city requirements for thickness, width, and finishes are addressed.
3. Excavation and base preparation Longevity starts under the slab. We excavate to the required depth, typically 4 to 6 inches for light commercial sidewalks and 6 or more where carts, pallet jacks, or maintenance vehicles will travel. Soft or muddy soil is removed and replaced with compacted aggregate base. On Conway clay soils, we often use additional compaction and, where needed, a geotextile separator so the subgrade does not pump and cause settling later.
4. Forms, reinforcement, and joints We set wood or steel forms to the exact slope and elevation needed to shed water away from buildings and toward approved drainage. For most commercial sidewalks we use 3000 to 4000 psi concrete with fiber reinforcement and, depending on load, add rebar or welded wire mesh. Control joints are saw cut or hand tooled at proper spacing to control cracking, typically in squares or rectangles no more than about 5 to 6 feet apart, adjusted to the actual width of the walk.
5. Placement, finishing, and curing We place concrete in manageable sections so finishers are never rushed. For commercial sidewalks we usually apply a light broom finish that provides traction in wet weather and meets ADA slip resistance expectations. Edges are rounded for comfort and durability. After finishing, we apply a curing method appropriate for the season, which might be curing compound or wet curing, to maximize strength and minimize surface checking. Finally, we barricade the area and coordinate with you on reopening schedules so foot traffic and deliveries are safely rerouted while the concrete gains strength.
ADA ramps are not just about pouring a little concrete at a door. They require specific slopes, landings, clearances, and transitions to be safe and code compliant. Primetime Concrete Conway designs ramps that respect the numbers and still feel comfortable to use.
We start with measurements from the finished floor of your entry down to the parking or sidewalk grade. From there, we design slopes at or below 1:12 (1 inch of rise for every 12 inches of run) and size landings so they are large enough for a wheelchair to turn. We also pay attention to cross slope, keeping it mild enough that wheelchairs do not tend to pull to one side, especially important in areas where water must shed away from the building.
Handrail and edge protection requirements can change based on ramp height and configuration. If your ramp needs rails, we coordinate with your rail installer so post locations, mounting plates, and embeds are properly planned before concrete is placed. At parking lot transitions, we integrate truncated dome detectable warning surfaces where required, and set them at correct depth so the walking surface stays flush without creating a trip edge.
Surface texture matters in Arkansas weather. On shaded north sides of buildings in Conway, ramps may stay damp longer and are more prone to algae growth. For those situations we recommend a slightly more aggressive broom finish and sometimes a penetrating sealer so the surface stays grippy without becoming rough enough to catch cart wheels. Where carts and dollies are common, like grocery or medical supply entrances, we may use a directional broom that balances traction with smoother rolling in the main direction of travel.
Pricing and scheduling are questions we hear early, and both are influenced by Conway's climate, soils, and site conditions.
From a scheduling standpoint, spring and fall are usually the easiest windows for commercial sidewalk installation and ADA ramps in Conway. Temperatures are moderate, which is ideal for concrete curing, and we can often work longer days without fighting extreme heat. In summer, we pour earlier in the morning, use set-control admixtures when needed, and pay close attention to wind and sun exposure to avoid rapid drying that can lead to surface problems. Winter work is possible, but we have to monitor forecasts carefully, protect fresh concrete from freezing, and sometimes adjust mixes and cure times.
Several factors influence cost:
• Thickness and reinforcement: Heavier use areas near loading docks, dumpster pads, or fire lanes might need 6 inch concrete with rebar, while light foot traffic walkways might be fine with 4 inches and fiber. We explain the tradeoffs so you are not overbuilding or underbuilding.
• Site access and demo: Removing old sidewalks, dealing with tight spaces between buildings, or working around mature trees or heavy landscaping can add time and disposal costs. If tree roots caused your old walk to heave, we will talk about root pruning, root barriers, or rerouting the new walk to avoid repeating the issue.
• Drainage corrections: If your new ramps or sidewalks need added drains, grading adjustments, or tie-ins to existing storm systems, that adds extra labor and materials but often solves chronic puddling problems that have been damaging your old concrete for years.
During our estimate, Primetime Concrete Conway gives you a clear breakdown of what is necessary for safety and compliance and what is optional or aesthetic. That way you can prioritize phases if your property has a lot of concrete that needs attention but you need to spread the investment across budget cycles.
Working on an active commercial property means communication is as important as craftsmanship. Before work begins, we confirm staging areas for equipment and materials, identify which entrances must stay open, and set daily start times that work with your tenants or business hours. For busy sites along major roads like Prince Street or Harkrider, we can schedule higher impact work early in the day or on weekends when traffic and parking demand are lighter.
During construction, we use clear barricades, caution tape, and signage to guide pedestrians safely around work zones. If we are tying into city sidewalks or driveway aprons, we coordinate with the city on any needed temporary closures and inspections. Our crews keep the site as tidy as possible, cleaning up concrete splatter, sweeping, and making sure your property does not look like a long term jobsite.
After the pour, we walk the project with you and point out control joints, expansion joints, and any special details, and we explain recommended cure times before allowing foot traffic, carts, delivery dollies, or vehicles. For most standard sidewalks, light foot traffic is usually allowed after about 24 hours, with heavier use following the curing schedule we outline. We also provide tips on de-icing products that are safer for new concrete, and how to handle power washing so finishes and joint sealants are not damaged.
If you are planning a commercial sidewalk installation or ADA ramp upgrade anywhere in Conway or the nearby communities, Primetime Concrete Conway is happy to meet on site, run through your options, and provide a detailed written proposal so you can move forward with confidence.
Professional commercial sidewalks & ada ramps, done right the first time, quality materials, honest pricing, and results that last.Primetime Concrete Conway